Save Money by Reducing Electric Use During Peak Periods
Sign up for Choptank Electric’s Load Control Rider program
Cooperative members can receive credit for controlling their electric load during certain peak periods through our voluntary Load Control Rider program. Members billed under the General Service — Irrigation (FI) rate or a rate that includes a demand component (outlined below) can enroll in this free program. There is no penalty for not curtailing your use during the designated peak periods — but a big benefit if you can control your electric load!
Members will receive a $6 payout for each kW curtailed during each PJM 5-High peak and a $15 payout for each kW curtailed during the Transmission peak. Notice of peak periods will be issued by Choptank Electric via text message (members may opt in through SmartHub) and our website under “Your Power.”
Load Control Rider (LC)
• Can be paired with rates that include a demand component: Small Power (S), Medium Power (M), and Primary (P) rates
• Must have a curtailable load of at least 50 kW
Load Control Rider
– Irrigation (LC-FI)
• Can be paired only with General Service — Irrigation (FI) rate
• Must have a curtailable load of at least 25 kW
If you would like to enroll in the Load Control Rider program, give us a call at 877-892-0001.